AI infrastructure · Southeast Asia

Power secured before capacity is promised.

We develop AI data centre capacity in Thailand and the Philippines, anchored in contracted power — not grid queue positions.

Request capacity brief
Scroll
0+Years of global operations
0+Countries & territories since 2014
0 GW+Secured capacity, Thailand
0Fully signed sites
Approach

Power first. Everything else follows.

Power on paper is not power delivered. We sign directly with producers, before a hall is sold.

Knozen team reviewing site plans
Supply

Contracted power, not queue positions.

The grid is standby, not the source. No interconnection queue between the contract and an energised hall.

Phasing

Phased 50 MW+ modules.

Delivered in 50 MW+ phases on a 10–12 month cycle. Nobody waits for the full campus.

Disclosure

No speculative declarations.

We announce only capacity backed by a signed power agreement. Every figure here stands on a document.

Inside the hall
100 kW+
racks, liquid cooled.
Module50 MW+ phases
Cycle10–12 months per phase
SupplyDirect IPP/SPP · grid on standby
Markets

Screened, not guessed.

Singapore
Excluded
Power quotas exhausted. No viable route to supply.
Malaysia
Excluded
Water stress. Johor approvals suspended.
Indonesia
Excluded
Regulatory terms shift faster than a ten-year asset allows.
Thailand & Philippines
Priority focus
Power headroom, water, subsea routes and incentives in one place.
THAILAND6 SIGNED SITES · 1 GW+RFS 2027–2030PHILIPPINESSECOND MARKET ·IN DEVELOPMENTMALAYSIA — EXCLUDEDINDONESIA — EXCLUDEDSINGAPORE — EXCLUDEDSUBSEA → USSUBSEA → ASIA
Thailand · priority Philippines · in development Excluded
Site locations indicative · detail under NDA
TH · Priority market

Thailand.

Six signed sites and 1 GW+ gross secured. The furthest along of our two markets.

  • Direct IPP/SPP supply, grid on standby.
  • 50 MW+ modules, 10–12 month cycle.
  • Ready for service from 2027 to 2030.
PH · In development

Philippines.

Our second market, at an earlier stage. Nothing announced before supply is signed.

  • Gas-cluster co-location under development.
  • Screened for power headroom and water.
  • Subsea routes to both US and Asia.
Capacity

Contracted capacity.

0 GW+
1 GW+ gross · 6 signed
sites · Thailand
2027
First capacity
from 2027
Next
Philippines pipeline
in development
Indicative phasing · 50 MW modules · ready for service 2027–2030
50 MW
50 MW
2027First halls RFS
50 MW
50 MW
50 MW
2028Phase build-out
50 MW
50 MW
50 MW
50 MW
2029Phase build-out
50 MW
50 MW
50 MW
50 MW
2030Full campus

Site-level capacity, phasing and delivery schedule available under NDA.

Request capacity brief
Cooperation

Two ways in, depending on the stage.

For capital partners

Early stage · greenfield.

Partners enter through debt on greenfield sites, converting to equity once the project is de-risked.

Debt entryDe-riskedEquity
For anchor tenants

Later stage · land secured.

Long-term offtake is locked in advance, capacity built to suit one end customer on secured land and power.

Offtake lockedLand + powerBuild-to-suit
Manifesto

Intelligence needs a building.

Contact

Let's build Southeast Asia's next AI infrastructure platform.

We are talking to capacity offtakers, capital partners, and owners of power and land.

marketing@knozen.ai
I'm reaching out as a…